Skip to main content

Terminal Proof

Acceptance gates

The orchestrator checks every gate in acceptance_gates before transitioning to FROZEN_PASS:

GateStatus
goal_materialized_via_canonical_lifecyclePASS
docs_architecture_completePASS
docs_content_coverage_completePASS
docs_build_passPASS
docs_link_check_passPASS
docs_mermaid_diagrams_validPASS
docs_source_accuracy_audit_passPASS
docs_visual_audit_passPASS
docs_security_audit_passPASS
docs_governed_commit_recordedPASS
pr_opened_at_canonical_headPASS
ci_checks_passPASS
merge_approval_materialized_at_exact_headPASS
governed_merge_to_main_completedPASS
docs_site_deployment_health_passPASS

Final declaration

ASF50_DOCS_PORTAL_001=COMPLETE
DOCS_SITE_DEPLOYED=YES
DOCS_URL=https://bee1xgroup.github.io/ASF50/
NEXT_REAL_OWNER_GATE=NONE
ASF50_FIRST_REAL_PRODUCTION_GOAL=PASS
ASF50_DOCS_PORTAL_OPERATIONAL=YES

What the next operator should do

  1. Read Your Next ASF50 Goal for the next master-goal template.
  2. Apply the same pattern: bounded contract, bounded commit, PR, owner review, merge, deploy.
  3. Use the Operator Handbook for day-to-day operations.

This walkthrough is now itself part of the durable documentation. Future operators pattern-match against it.